Târgu Mureș City Hall (Municipality of Târgu Mureș)

Urban Light Industrial Park

A compact business and production campus inside the city, built for SMEs in light manufacturing, engineering, technology and service-based production

Aerial concept of the Urban Light Industrial Park along the Mureș river
Source: Urban Light Industrial Park (presentation)
40.8 ha
gross concept area
≈10,000 m²
typical plot module
125–155k m²
potential building area
25–35
potential occupiers
500 - 3,000 m²
indicative unit range (SME units)
€120–200 million
indicative full private investment potential
1,500–2,000
long-term jobs
≈25–35 MW
renewable energy potential (solar + other sources)

A 40.8 ha light-industrial and innovation park concept in Târgu Mureș, next to the Mureș river corridor and the aeroclub zone, with modular plots and small business units for SMEs. Heavy industry is excluded; the park is planned in three phases with an indicative private investment potential of €120–200 million.

The opportunity

A 40.8 ha development opportunity adjacent to the Mureș river corridor and aeroclub zone, designed for a modern industrial and innovation park.

The park offers production space close to the city. It suits companies with tens of employees, moderate freight volumes and a market in the metropolitan area. Heavy industry is excluded.

  • The proposition: flexible plots for light manufacturing, logistics, food production, medical technology, electronics, construction systems and research facilities.
  • Investor logic: land development can combine plot sales, long leases, build-⁠to-⁠suit projects, energy services and long-⁠term park management income.

Target occupiers

High-⁠emission, high-⁠noise, hazardous and HGV-intensive uses are excluded or controlled.

  • Medical and lab technology: devices, diagnostics, lab equipment
  • Electronics: assembly, testing, controls
  • Engineering: precision work, prototyping, automation
  • Creative production: furniture, interiors, print, fabrication
  • Food craft: specialty production, packaging, cold rooms
  • Urban services: maintenance, e-⁠commerce, last-⁠mile support

Location and planning framework

The site benefits from a defined urban plan, a strong regional location and direct access to the Mureș river corridor and aeroclub zone.

  • Parcel structure: most plots range from approximately 9,900 to 10,350 m². Larger edge plots can support major occupiers.
  • River edge: the Mureș corridor requires a continuous ecological and flood-resilient landscape buffer.
  • Aviation edge: building height, lighting, obstacles and uses require coordination with aviation authorities.
  • Access: the entrance and heavy-⁠vehicle connection must be confirmed through a traffic and junction study.

Small Business Unit model

  • Each unit combines office or showroom, workshop or production, and storage or service space at one address.
  • Indicative module: 500–1,000 m². Modules combine for occupiers of 1,500–3,000+ m².
  • Adjacent modules connect, so a company can grow without relocating.
  • Utilities, fire strategy, access and common infrastructure are planned at park level.
  • Shared services: security, meeting rooms, waste points, EV charging, digital park management.

Masterplan and operations

  • Office and showroom frontage faces the street. Operations and service courts sit at the rear.
  • Customer and employee movement is separated from service access.
  • Solar-⁠ready roofs, heat pumps and an all-⁠electric option.
  • Permeable surfaces and stormwater retention.
  • Cycling, public transport, EV charging and compact parking.
  • Access control, smart meters and GIS/BIM asset management.

Phasing and investment framework

The project is structured in three well-⁠defined phases, enabling a market-responsive approach and multiple investment entry points. Each phase is functional and can operate stand-⁠alone.

  • Phase 1 (market entry): 13.2 ha, 12 buildings, ≈41,000 m² GBA, 2026–2028 estimated delivery, indicative investment €50–70 million
  • Phase 2 (expansion): 14.0 ha, 13 buildings, ≈47,000 m² GBA, 2028–2030 estimated delivery, indicative investment €55–75 million
  • Phase 3 (full potential): 13.6 ha, 10 buildings, ≈40,000 m² GBA, 2030–2032 estimated delivery, indicative investment €45–65 million

Investment model

  • Lease of modular units
  • Sale of units, where legally and technically suitable
  • Build-⁠to-⁠suit for identified occupiers
  • Park services: management, energy, meeting and shared operations

Impact

  • ≈1,000–1,500 jobs during construction; ≈1,500–2,000 long-⁠term jobs
  • 30–40% lower operational emissions (vs. conventional industrial parks)
  • ≈25–35 MW renewable energy potential (solar + other sources)
  • > 20 ha green areas and buffers; 100% sustainable stormwater management

Photos

Zoning plan of the Urban Light Industrial Park site
Zoning plan of the Urban Light Industrial Park site
1 / 1

Location

Târgu Mureș City Hall: projects